A BILL TO BE ENTITLED
|
|
AN ACT
|
|
relating to requirements for underground facility damage |
|
prevention and safety. |
|
BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF TEXAS: |
|
SECTION 1. Section 251.002(6), Utilities Code, is amended |
|
to read as follows: |
|
(6) "Excavator" means an individual who or legal |
|
entity [a person] that actually excavates or intends to excavate in |
|
this state. |
|
SECTION 2. Subchapter A, Chapter 251, Utilities Code, is |
|
amended by adding Section 251.0045 to read as follows: |
|
Sec. 251.0045. EXCAVATION BY SUBCONTRACTOR. A |
|
subcontractor who performs an excavation operation may not begin |
|
the excavation unless the subcontractor has complied with the |
|
requirements this chapter imposes on an excavator, regardless of |
|
whether the general contractor that hired the subcontractor has |
|
complied with the requirements. |
|
SECTION 3. Section 251.151, Utilities Code, is amended by |
|
amending Subsection (a) and adding Subsection (a-1) to read as |
|
follows: |
|
(a) Except as provided by Sections 251.155 and 251.156, an |
|
excavator [a person] who intends to excavate shall notify a |
|
notification center not earlier than the 14th day before the date |
|
the excavation is to begin [or later than the 48th hour before the
|
|
time the excavation is to begin], excluding Saturdays, Sundays, and |
|
legal holidays. An excavator may not excavate: |
|
(1) before 8 a.m. on the third day after the date on |
|
which the excavator gives the notice, excluding Saturdays, Sundays, |
|
and legal holidays; or |
|
(2) after the 21st day after the date on which the |
|
excavator gives the notice, including Saturdays, Sundays, and legal |
|
holidays. |
|
(a-1) If markings made by an operator after notice is given |
|
under Subsection (a) for an excavation operation showing the |
|
location of underground facilities in the excavation area are no |
|
longer visible, are unclear, or are damaged, the excavator shall |
|
give another notice under Subsection (a) for the unfinished |
|
portions of the excavation operation. |
|
SECTION 4. Sections 251.157(a) and (d), Utilities Code, are |
|
amended to read as follows: |
|
(a) Each Class A underground facility operator contacted by |
|
the notification system shall mark the approximate location of its |
|
underground facilities at or near the site of the proposed |
|
excavation if the operator believes that marking the location is |
|
necessary. The operator shall mark the location not later than: |
|
(1) 8 a.m. on the third day following the date on which |
|
the excavator gives to the notification system notice of intent to |
|
excavate under Section 251.151(a) [the 48th hour after the time the
|
|
excavator gives to the notification system notice of intent to
|
|
excavate], excluding Saturdays, Sundays, and legal holidays; |
|
[(2)
11:59 a.m. on the Tuesday following a Saturday
|
|
notification unless the intervening Monday is a holiday;
|
|
[(3)
11:59 a.m. on the Wednesday following a Saturday
|
|
notification if the intervening Monday is a holiday;] or |
|
(2) [(4)] a time agreed to by the operator and the |
|
excavator. |
|
(d) Not later than 8 a.m. on the third day following the date |
|
on which the excavator gives to the notification system notice of |
|
intent to excavate under Section 251.151(a), excluding Saturdays, |
|
Sundays, and legal holidays [the 48th hour after the time the
|
|
excavator gives to the notification center notice of intent to
|
|
excavate], an operator contacted by the notification center shall |
|
notify the excavator of the operator's plans to not mark the |
|
proximate location of an underground facility at or near the site of |
|
the proposed excavation. The operator must provide the |
|
notification by e-mail or facsimile or by another verifiable |
|
electronic method approved by the board. |
|
SECTION 5. Section 251.151(b), Utilities Code, is repealed. |
|
SECTION 6. This Act takes effect September 1, 2017. |