AN ACT
|
|
relating to seawater desalination projects. |
|
BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF TEXAS: |
|
SECTION 1. Section 39.203, Utilities Code, is amended by |
|
adding Subsection (i) to read as follows: |
|
(i) The commission, in cooperation with transmission and |
|
distribution utilities and the ERCOT independent system operator, |
|
shall study whether existing transmission and distribution |
|
planning processes are sufficient to provide adequate |
|
infrastructure for seawater desalination projects. If the |
|
commission determines that statutory changes are needed to ensure |
|
that adequate infrastructure is developed for projects of that |
|
kind, the commission shall include recommendations in the report |
|
required by Section 31.003. |
|
SECTION 2. Subchapter Z, Chapter 39, Utilities Code, is |
|
amended by adding Section 39.9055 to read as follows: |
|
Sec. 39.9055. EXAMINATION OF DEMAND RESPONSE POTENTIAL OF |
|
SEAWATER DESALINATION PROJECTS. The commission and the ERCOT |
|
independent system operator shall study the potential for seawater |
|
desalination projects to participate in existing demand response |
|
opportunities in the ERCOT market. To the extent feasible, the |
|
study shall determine whether the operational characteristics of |
|
seawater desalination projects enable projects of that kind to |
|
participate in ERCOT-operated ancillary services markets or other |
|
competitively supplied demand response opportunities. The study |
|
shall also determine the potential economic benefit to a seawater |
|
desalination project if the project is able to reduce its demand |
|
during peak pricing periods. The commission shall include the |
|
results of the study in the report required by Section 31.003. |
|
SECTION 3. Section 11.121, Water Code, is amended to read as |
|
follows: |
|
Sec. 11.121. PERMIT REQUIRED. Except as provided in |
|
Sections 11.1405, 11.142, 11.1421, and 11.1422 [of this code], no |
|
person may appropriate any state water or begin construction of any |
|
work designed for the storage, taking, or diversion of water |
|
without first obtaining a permit from the commission to make the |
|
appropriation. |
|
SECTION 4. Subchapter D, Chapter 11, Water Code, is amended |
|
by adding Section 11.1405 to read as follows: |
|
Sec. 11.1405. DESALINATION OF SEAWATER FOR USE FOR |
|
INDUSTRIAL PURPOSES. (a) The commission may issue a permit under |
|
this section to authorize a diversion of state water from the Gulf |
|
of Mexico or a bay or arm of the Gulf of Mexico for desalination and |
|
use for industrial purposes if: |
|
(1) the point of diversion is located less than three |
|
miles seaward of any point located on the coast of this state; or |
|
(2) the seawater contains a total dissolved solids |
|
concentration based on a yearly average of samples taken monthly at |
|
the water source of less than 20,000 milligrams per liter. |
|
(b) A person may divert state water from the Gulf of Mexico |
|
or a bay or arm of the Gulf of Mexico for desalination and use for |
|
industrial purposes without obtaining a permit if Subsection (a) |
|
does not apply. |
|
(c) A person who diverts and uses state water that consists |
|
of marine seawater under a permit issued under Subsection (a) or as |
|
authorized by Subsection (b) must determine the total dissolved |
|
solids concentration of the seawater at the water source by monthly |
|
sampling and analysis and provide the data collected to the |
|
commission. A person may not begin construction of a facility for |
|
the diversion of marine seawater for the purposes provided by this |
|
section without obtaining a permit until the person has provided |
|
data to the commission based on the analysis of samples taken at the |
|
water source over a period of at least one year demonstrating that |
|
Subsection (a)(2) does not apply. A person who has begun |
|
construction of a facility for the diversion of marine seawater for |
|
the purposes provided by this section without obtaining a permit |
|
because the person has demonstrated that Subsection (a)(2) does not |
|
apply is not required to obtain a permit for the facility if the |
|
total dissolved solids concentration of the seawater at the water |
|
source subsequently changes so that Subsection (a)(2) applies. |
|
(d) A permit application under this section must be |
|
submitted as required by commission rule. |
|
(e) The commission is not required to make a finding of |
|
water availability for an application under this section. |
|
(f) The commission shall evaluate whether any proposed |
|
diversion under this section is consistent with any applicable |
|
environmental flow standards established under Section 11.1471. |
|
(g) The commission may include any provision in a permit |
|
issued under this section that the commission considers necessary |
|
to comply with the environmental flow standards established under |
|
Section 11.1471. |
|
(h) The commission shall adopt rules providing an expedited |
|
procedure for acting on an application for a permit under |
|
Subsection (a). The rules must provide for notice, an opportunity |
|
for the submission of written comment, and an opportunity for a |
|
contested case hearing regarding commission actions relating to an |
|
application for a permit. |
|
SECTION 5. Subchapter B, Chapter 26, Water Code, is amended |
|
by adding Section 26.0272 to read as follows: |
|
Sec. 26.0272. PERMITS AUTHORIZING DISCHARGES FROM CERTAIN |
|
SEAWATER DESALINATION FACILITIES. (a) This section applies only to |
|
a facility that generates water treatment residuals from the |
|
desalination of seawater solely for use as part of an industrial |
|
process. |
|
(b) The commission may issue a permit for the discharge of |
|
water treatment residuals from the desalination of seawater into |
|
the portion of the Gulf of Mexico inside the territorial limits of |
|
the state. |
|
(c) Before issuing a permit under this section, the |
|
commission must evaluate the discharge of water treatment residuals |
|
from the desalination of seawater into the Gulf of Mexico for |
|
compliance with the state water quality standards adopted by the |
|
commission, the requirements of the Texas Pollutant Discharge |
|
Elimination System program, and applicable federal law. |
|
(d) The commission may issue individual permits or a general |
|
permit under this section. If the commission elects to issue |
|
individual permits under this section, the commission must |
|
establish procedures for the review of an application that, at a |
|
minimum, comply with the requirements of Subchapter M, Chapter 5. |
|
If the commission elects to issue a general permit under this |
|
section, the commission must comply with the requirements of |
|
Section 26.040. |
|
SECTION 6. Section 27.021, Water Code, is amended by adding |
|
Subsection (a-1) to read as follows: |
|
(a-1) A permit issued under this section may authorize the |
|
disposal of water treatment residuals produced by the desalination |
|
of seawater. |
|
SECTION 7. Section 27.025, Water Code, is amended by adding |
|
Subsection (a-1) to read as follows: |
|
(a-1) A general permit issued under this section may |
|
authorize an injection well for the disposal of concentrate |
|
produced by the desalination of seawater. The general permit must |
|
include any requirements necessary to maintain delegation of the |
|
federal underground injection control program administered by the |
|
commission. |
|
SECTION 8. This Act takes effect immediately if it receives |
|
a vote of two-thirds of all the members elected to each house, as |
|
provided by Section 39, Article III, Texas Constitution. If this |
|
Act does not receive the vote necessary for immediate effect, this |
|
Act takes effect September 1, 2015. |
|
|
|
______________________________ |
______________________________ |
|
President of the Senate |
Speaker of the House |
|
|
|
I certify that H.B. No. 4097 was passed by the House on May |
|
11, 2015, by the following vote: Yeas 137, Nays 0, 1 present, not |
|
voting; and that the House concurred in Senate amendments to H.B. |
|
No. 4097 on May 26, 2015, by the following vote: Yeas 145, Nays 0, |
|
2 present, not voting. |
|
|
|
______________________________ |
|
Chief Clerk of the House |
|
|
I certify that H.B. No. 4097 was passed by the Senate, with |
|
amendments, on May 23, 2015, by the following vote: Yeas 31, Nays |
|
0. |
|
|
|
______________________________ |
|
Secretary of the Senate |
|
APPROVED: __________________ |
|
Date |
|
|
|
__________________ |
|
Governor |